After a chat with Travis, from Diesel Marine, it looks like we should be ready to launch week commencing 5th October!
There’s a bit to do before then – the engine needs reassembling, the shafts need drawing and the couplings and bearings need inspecting / renewing.
Jon from Estuary Vessel Management needs to re-apply epoxy to the spray rails and then antifoul the hull.
Let’s see if by some miracle it can all be pulled together!
